Contractors, consultants or building owners installing new or upgrading electrical services should review Norfolk Power’s Industrial and Commercial Specification and must complete the Industrial and Commercial Service Request Form and send it to the Engineering Department. Please include a site plan drawing showing all existing and proposed property lines, existing and proposed building foot prints, existing pole locations, proposed electrical room and/or proposed metering location(s). For large services where a dedicated customer transformer will be required, the site plan should also show the proposed transformer location. The transformer base installation drawings are also available for review.
If new services and meters are being added to an existing main service in an existing commercial or industrial building, a site plan drawing will not be required but a drawing showing the electrical room with the new proposed meter location will be required.
Send Information to:
Norfolk Power
Engineering Department
70 Victoria Street
Simcoe, Ontario
Phone (519) 426-4440 Ext. 2270
Fax (519) 426-9205
Email
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Norfolk Power will prepare a layout and an estimated cost for the installation. All design and construction must be compliant with Regulation 22/04. A quotation will be sent to the customer or customer’s representative. A layout and estimate can take up to 15 days from the time Norfolk Power receives the completed form. If transformers are required, transformer delivery can be up to 26 weeks. Norfolk Power will not order transformers until payment for the installation cost is received.
After payment has been received and the electrical service has been inspected by Electircal Safety Authority (ESA), the electrical contractor is responsible to schedule the connection date with Norfolk Power which can be up to 15 days from the time the contractor calls in to schedule the connection.