For temporary service during construction, customers or contractors must complete the Temporary Service Request Form. The information requested on the form must be provided to the Engineering Department along with a site plan drawing or sketch showing building locations and proposed point of supply along with existing pole locations and proposed metering location.
Send Information to:
Norfolk Power Engineering Department
70 Victoria Street
Simcoe, Ontario
N3Y-4N6
Phone (519) 426-4440 Ext. 2270
Fax (519) 426-9205
Email
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.
Norfolk Power will prepare a layout and determine the cost of the temporary installation and removal. The customer or contractor is responsible for the total installation and removal cost which must be paid prior Norfolk Power starting any work. A quotation well be sent to the customer or customer’s representative, A layout and a quotation can take up to 15 days from the time Norfolk Power receives the completed form. If transformers are required, transformer delivery can be several weeks. Norfolk Power will not order transformers until payment is received.
After payment has been received and the temporary electrical service has been inspected by Electrical Safety Authority (ESA) , the electrical contractor is responsible to schedule the connection date with Norfolk Power which can be up to 15 days from the time the contractor calls in to schedule the connection.